All articles

The Field Photo Checklist: Before, During, and After Every Roofing Job

October 27, 2026 · 9 min read

Every roofing crew already takes photos. The problem is rarely effort — it is consistency. One rep shoots every slope and labels them; the next shoots three close-ups and a driveway. The photos that end up mattering — the decking condition found at tear-off, the pre-existing siding damage a homeowner later blames on the crew, the flashing detail behind a leak callback — are exactly the ones nobody thought to take, because nothing on the day forced the shot. A checklist fixes that: the same before, during, and after sets on every job, captioned and filed on the job record by date, so the set is complete whether the job is a retail replacement, a repair, or a storm claim. This is the crew-facing companion to our guide to what a photo report should include for insurance supplements — that post covers the supplement-facing report; this one covers the shot list that feeds every report.

The rule behind the checklist: file by job, not by phone

A photo that stays in a camera roll is not documentation — it is a memory aid for the person who took it, and it leaves when they do. Every item below assumes the same filing rule: photos are taken on the job, captioned while the context is still in front of you, and saved to that job's record the same day, where the office, the production lead, and the next rep can all find them. Date and job are what make a set searchable months later, when a supplement, a warranty question, or a callback actually needs it. If your crew works in weak signal, pair this list with the sync discipline in our guide to mobile CRM in weak signal: keep the originals until the office confirms the record shows them.

Before: identity, context, and the roof as you found it

  • The property from the street, with the house number visible where you can get it — the shot that proves which job every later photo belongs to
  • All four elevations of the house and the full roof from the ground, before anything is touched
  • Every slope wide, then mid-range, then close-up where there is damage — labeled by slope, with a scale reference in close-ups where size matters
  • Damage detail: hail hits chalked before photographing, wind creasing and lifted shingles, missing or cracked shingles, exposed mat
  • Penetrations and transitions, one set each: pipe boots, vents, chimneys, skylights, valleys, step and counter flashing, and wall intersections
  • Ventilation as found: intake and exhaust vents present, blocked, or missing — a condition you will be asked about later
  • Soft metals and collateral: gutters, downspouts, vent caps, flashing, siding, and window screens, including pre-existing dents and damage
  • Interior evidence where there is a leak history: ceiling and wall staining, attic water marks where accessible, photographed promptly before anything is painted or patched
  • Pre-existing conditions the crew did not cause: cracked driveways and walkways, landscaping and siding condition, anything already damaged near the work area

The before set does two jobs at once. For a claim or an estimate, it is scope evidence. For the company, it is protection: the pre-existing-condition shots are the ones that end arguments about damage your crew never touched, and they only work if they were taken before the first ladder went up.

During: the window you cannot retake

  • Tear-off layers as found — the number of layers and their condition, before they are hauled away
  • Decking exposed: rot, gaps, soft or deteriorated boards, and any hidden damage, shot before it is replaced or covered
  • The decking count as it happens, if decking is billed per sheet — the photo set behind the change-order conversation in our guide to change orders and hidden deck damage
  • Underlayment and ice-and-water coverage as installed, before shingles cover it
  • Flashing, drip edge, and ventilation work as installed — the code-required items photographed as built conditions, not just claimed on a line
  • Any surprise that changes the job — structural findings, extra layers, unusable flashing — photographed before the crew works around it, with the homeowner conversation noted on the record
  • Progress at the end of each day on multi-day jobs, so the office can answer "where are we?" without calling the roof

The during set is the one with an expiry time. Before shots can sometimes be re-taken on a return visit; after shots obviously can. The exposed deck, the layers, and the underlayment exist for hours. That is why the checklist puts a named owner on this set — usually the crew lead — instead of assuming whoever is nearest will remember.

After: the same angles, the finished details, and the ground

  • The completed roof from the ground and the street, matching the before angles where you can
  • Every slope finished, plus the detail shots: ridge, valleys, flashing, pipe boots, and vents as completed work
  • The specific repairs or replacements the job was sold on, shown finished — the homeowner and the adjuster should be able to match after to before without guessing
  • Interior leak areas re-checked where the job included them, and the attic or ceiling condition if the original problem was a leak
  • The ground as you left it: cleanup complete, materials and debris gone, landscaping, driveway, and gutters as found
  • Anything left incomplete, stated plainly in a photo and a note rather than left out — a punch item photographed is a task; a punch item hidden is a callback

Captions: where, what, and what it supports

An unlabeled set forces everyone after you to guess, and guesses do not survive a supplement review, a warranty dispute, or a simple "which slope was that?" three weeks later. Caption each photo the same way, in the moment: where it is (slope, elevation, penetration, or room), what it shows (the condition, plainly named), and where it matters, what it supports (the estimate line, the supplement item, or the change order). "South slope, valley: step flashing rusted through — supports flashing replacement line" is documentation. A timestamped file name is not. The caption habit is also what turns a checklist set into a finished report without a second round of office work: the photos arrive already explained.

The shots crews most often miss

  • The house number and the street context shot — skipped because it feels too basic to count, needed because every other photo depends on it
  • Decking during tear-off — skipped because tear-off day is busy, which is exactly why it has to be a checklist item with an owner
  • Pre-existing damage near the work area — skipped because it is not the crew's problem that day, and raised later precisely because there is no photo
  • Ventilation and penetrations as found — skipped because the eye goes to shingle damage first, then requested by name in supplement and warranty conversations
  • The after set from the same angles as the before set — skipped in the rush to leave, and the reason completion photos get argued with instead of accepted

None of these misses is a skill problem. They are what happens when documentation depends on memory on a loud, hot, schedule-driven job site. The checklist exists so the set does not depend on who happened to be on the roof that day — the same reason a storm season playbook names an owner for intake and inspection instead of leaving them to whoever is free.

That filing shape is what GableFlow is built around: take photos on the job, caption them per photo, and generate a branded photo report saved right to the job's paperwork — with the photos living on the same record as the six-stage pipeline (Lead → Prospect → Approved → Completed → Invoiced → Closed), the branded estimate, the claim details, and the invoice and payments, and team roles (owner, admin, manager, and user) so the crew lead who shot the tear-off and the office staffer building the report are looking at the same set. See how GableFlow's photo reports and field features work in practice, or check the flat $40/month pricing — every feature included, unlimited seats, no per-seat fees, with a 7-day free trial.

Frequently asked questions

What photos should a roofing crew take on every job?

Three sets. Before: the property and house number, all elevations, every slope wide/mid-range/close-up with damage chalked and a scale reference, penetrations, valleys, flashing and ventilation as found, collateral and pre-existing damage, and interior leak evidence. During: tear-off layers, exposed decking and hidden damage, underlayment and code-required items as installed, and any surprise that changes the job. After: the finished roof from the same angles as the before set, completed detail work, and the cleaned-up ground — every photo captioned and filed on the job record the same day.

Why take pre-existing damage photos if the crew did not cause it?

Because that is exactly when the photo has value. A dated before shot of a cracked driveway, dented siding, or damaged landscaping — taken before the first ladder went up and filed on the job record — is the record that settles a later claim that the crew caused it. Without it, the conversation is one memory against another. Pre-existing-condition photos are part of the before set on every job, not an accusation on any particular one.

Which roofing photos cannot be retaken later?

The during set. Exposed decking, the layers found at tear-off, hidden rot or deterioration, and underlayment before it is covered all exist only for the hours of the install. Once the new roof is on, that evidence is gone for good — which is why decking and tear-off photos are assigned to a named owner, usually the crew lead, instead of left to whoever remembers.

How should roofing photos be captioned?

With three things, written while you are still looking at the roof: where the photo is (slope, elevation, penetration, or room), what it shows (the damage or condition, plainly named), and what it supports where that applies (the estimate line, supplement item, or change order it belongs to). A caption in that form turns a picture into documentation a reviewer, a homeowner, or a teammate three weeks later can use without coming back to ask you.

Where should field photos be stored?

On the job record, filed by job and date — not in one crew member's camera roll. A camera-roll photo leaves with the phone and the person; a photo on the job record is visible to the office, production, and the next rep, and it is still findable when a supplement, warranty question, or callback needs it months later. Keep the phone originals until the office confirms the synced record shows the photos, then let the record be the source.

How does GableFlow handle job photos?

GableFlow photo reports are built from photos taken on the job, captioned per photo, branded with your company info, and saved to the job's paperwork — on the same record as the pipeline stage, branded estimate, claim details, and invoice and payments, with team roles for the field and the office. It is $40/month flat with every feature included and unlimited seats, with a 7-day free trial — see pricing, or features for the full workflow.

Run your jobs the way this article describes.

GableFlow gives roofing companies the pipeline, estimates, and paperwork in one place — $40/month, everything included.

Get started

Ready to run your jobs on GableFlow?

Leave spreadsheets and group texts behind.